#81862: "Contracts"
De què tracta aquest informe?
Què ha passat? Si us plau, selecciona a sota
Descripció detallada
• Quina part de les regles no s'han respectat per l'adaptació de BGA
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910).• És visible la violació de les normes durant la repetició de la partida? Si es així, en quin número de moviment?
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position).• Quin és el meu navegador?
Google Chrome v109
Historial de denúncies
The elevation granted by the contract was automatically build because there was only one place available.
Contract rewards are not mandatory.
The conduit granted by the contract was automatically built.
When there isn't only one place available, there is an option to skip building the structure. It should always be an option.
Afegeix quelcom a aquest report
- Un altre ID de partida / ID de moviment
- Prémer F5 ha ajudat a arreglar el problema?
- El problema apareix diversos cops? Cada cop? a l'atzar?
- Si tens una captura de pantalla d'aquest error (bona pràctica), pots utilitzar Imgur.com per pujar-ho i copiar i enganxar el link aquí.