#71503: "A lot more automation in production phase through pre-planning"
De què tracta aquest informe?
Què ha passat? Si us plau, selecciona a sota
Què ha passat? Si us plau, selecciona a sota
Si us plau, comprova si ja existeix un informe sobre el mateix tema
En cas afirmatiu, si us plau VOTA per aquest informe. Els informes amb més vots tenen PRIORITAT!
| # | Status | Votes | Game | Type | Title | Last update |
|---|
Descripció detallada
-
• Si us plau, copia i enganxa el missatge d'error que veus a la pantalla, si és que n'hi ha algun.
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
-
• Si us plau, què volies fer, què vas fer i que va succeir
• Quin és el meu navegador?
Google Chrome v102
-
• Si us plau, copieu/enganxeu el text mostrat en anglès en comptes del teu idioma. Si tens una captura de pantalla d'aquest error (bona pràctica), pots utilitzar un servei d'allotjament d'imatges de la teva elecció (per exemple, snipboard.io) per penjar-la i copiar/enganxar l'enllaç aquí. És aquest text disponible al sistema de traducció? Si és així, ha sigut traduït fa més de 24 hores?
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
• Quin és el meu navegador?
Google Chrome v102
-
• Si us plau, expliqueu el vostre suggeriment de manera precisa i concisa, per que sigui el més fàcil d'entendre possible.
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
• Quin és el meu navegador?
Google Chrome v102
-
• Què es mostrava a la pantalla quan estaves bloquejat (pantalla en blanc? Part de la interfície del joc? Missatge d'error?)
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
• Quin és el meu navegador?
Google Chrome v102
-
• Quina part de les regles no s'han respectat per l'adaptació de BGA
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
-
• És visible la violació de les normes durant la repetició de la partida? Si es així, en quin número de moviment?
• Quin és el meu navegador?
Google Chrome v102
-
• Quina va ser l'acció del joc que volies fer?
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
-
• Què intentes fer per dur a terme aquesta acció del joc?
-
• Què va passar quan ho vas intentar fer (missatge d'error, missatge de la barra d'estat de la partida, ...)?
• Quin és el meu navegador?
Google Chrome v102
-
• A quina fase del joc va passar l'error (quina era la ordre en curs)?
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
-
• Què va passar quan vas intentar dur a terme l'acció del joc (missatge d'error, missatge de la barra d'estat del joc, ...)?
• Quin és el meu navegador?
Google Chrome v102
-
• Si us plau, descriviu el problema de visualització. Si tens una captura de pantalla d'aquest error (bona pràctica), pots utilitzar un servei d'allotjament d'imatges de la teva elecció (per exemple, snipboard.io) per penjar-la i copiar/enganxar l'enllaç aquí.
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
• Quin és el meu navegador?
Google Chrome v102
-
• Si us plau, copieu/enganxeu el text mostrat en anglès en comptes del teu idioma. Si tens una captura de pantalla d'aquest error (bona pràctica), pots utilitzar un servei d'allotjament d'imatges de la teva elecció (per exemple, snipboard.io) per penjar-la i copiar/enganxar l'enllaç aquí. És aquest text disponible al sistema de traducció? Si és així, ha sigut traduït fa més de 24 hores?
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
• Quin és el meu navegador?
Google Chrome v102
-
• Si us plau, expliqueu el vostre suggeriment de manera precisa i concisa, per que sigui el més fàcil d'entendre possible.
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
• Quin és el meu navegador?
Google Chrome v102
Historial de denúncies
This could be auto-placement of produced cube if there is only one card that needs it.
Or we could set *one* card to auto-build in priority and cubes would automatically go to it.
Afegeix quelcom a aquest report
- Un altre ID de partida / ID de moviment
- Prémer F5 ha ajudat a arreglar el problema?
- El problema apareix diversos cops? Cada cop? a l'atzar?
- Si tens una captura de pantalla d'aquest error (bona pràctica), pots utilitzar un servei d'allotjament d'imatges de la teva elecció (per exemple, snipboard.io) per penjar-la i copiar/enganxar l'enllaç aquí.
